Mixing concrete correctly is crucial for a solid foundation. Purchase cement, sand, aggregate, and a measuring bucket. Use a cement mixer for a thorough mix. Add water equal to 55% of the cement used, and perform a slump test. Spread the concrete immediately and cover with moist tarps for 28 days.
Concrete is often used for building foundations. If the concrete is mixed incorrectly, you run the risk of developing cracks in the foundation, which can weaken the building structure. A solid foundation involves precise measurements and mixing the concrete to the correct consistency.
There are several elements required for mixing concrete. From a home improvement store, purchase cement, sand, aggregate, a measuring bucket, and cloth tarps. A cement mixer is recommended for mixing concrete, as it does a much more thorough job than mixing by hand. A concrete mixer can be rented by the hour or by the day.
Mixing concrete involves the correct mix of cement, sand, and aggregate. Pour the cement into a bucket that will be used for measuring. Document how much cement is in the bucket, then transfer it to a cement mixer.
Use the same bucket and measure twice as much sand as concrete. Transfer the sand into the cement mix. Use the same bucket to measure out four times more aggregate than sand. Transfer the aggregate into the cement mix.
Mixing concrete involves a precise amount of water. The amount of water should be equal to 55 percent of the amount of cement used. When the right amount of water is added, the cement will be the consistency of pancake batter. This is important, as concrete that is too thick or thin will crack and threaten the foundation.
Perform the slump test to see if the concrete is the correct consistency after mixing. Place a drain cone on a flat surface and fill it with the concrete mix, making sure to remove any air bubbles. Gently lift the drop cone and see if about a third of the concrete collapses. If it does, the concrete has the right consistency. If you more or less collapse, the water will have to be adjusted accordingly.
Use a water hose to spray the ground where the concrete foundation will be laid. After mixing the concrete with the cement mixer, spread it immediately on the ground. It will dry out and begin to set quickly. Let the concrete sit for about an hour.
Cover the concrete with cloth tarps after it sets for an hour. Saturate the drop cloths and keep them moist for 14 days. Remove the tarps and spray the concrete regularly for another 14 days. After the concrete has set for a total of 28 days, it is ready to be built.