A building plan is a detailed guide for a construction project, ensuring each phase is completed in the correct order to maximize efficiency and avoid redoing work. It includes blueprints and diagrams, and can be created with a focus on cost, time, or both.
A building plan is a detailed and comprehensive plan for a building project. It provides the project manager with a clear step-by-step process to follow, ensuring that each phase of the project is performed in the correct order. This is important because a good plan will maximize efficiency by eliminating any possible need to redo work if a task is completed out of order. For example, pouring a concrete floor before the necessary plumbing work for drains is completed could result in the floor having to be ripped up and redone. A construction plan works similar to a flowchart, as completing each step allows you to take further steps.
Managing a construction project can be an extremely complex task, depending on the scope of the project. A good construction plan provides a framework for the project manager to follow. The plan can be compiled by a separate construction designer or project manager. In some cases, more than one individual or even entire companies may put together a plan for a very large or complex construction project.
Creating a building plan has many elements. Blueprints, diagrams and blueprints describing the finished project are extremely important and without them a good building plan cannot be undertaken. By studying these documents or their digital representations, the designer can decide what equipment, materials, and labor are needed to execute each phase of the plan, the timing of each phase, and how each phase will be performed. In a complex construction project, this requires an understanding of a very large number of related tasks and how each affects the others, as well as an understanding of the time required to complete them and the costs involved.
The building designer or project manager can approach a building plan in a variety of ways. The plan may be created with an absolute emphasis on keeping costs to a minimum, with an emphasis on completing the project as quickly as possible, or with the goal of somehow balancing cost and construction time. Cost and construction time are absolutely unrelated, but a change in one can often cause a change in the other. A good construction plan will take both elements into account and provide a framework for successfully completing the task in the shortest possible time while minimizing costs.