Mains pipes are pressurized pipes used to carry water, wastewater, and other materials. They can be gravity-fed or forced, depending on the terrain. Engineers determine the need for pressure and calculate the best size and pressure to avoid public health risks.
A mains pipe is a pressurized main pipe that can carry water, wastewater and other materials. Forced networks, as they are also known, are used in a variety of settings. Some systems combine this pipe with other types of pipe, as terrain and circumstances vary, to ensure that the system’s needs are met. Such pipes are typically installed by healthcare professionals, who are also responsible for maintaining them in proper condition so that they do not pose a risk to public health.
This name is often used to refer to water and sewer pipe discharges. This type of piping is often gravity fed. There are several reasons for this, including that the system will operate when there is no power, that it is easier to maintain, and that gravity feeding can make the system more efficient. Gravity feed can be accomplished by laying the pipe such that the contents tend to flow in a particular direction.
Such systems are designed so that the incoming water pressure in the inlet pipes, combined with the flow of the gravity-fed outlet pipes, prevents backflow. This is done to ensure that untreated wastewater does not flow back into the water mains, which would pose a major public health risk as well as being quite unpleasant.
However, there may be circumstances where the gravity feed of the outflow pipes is not sufficient. Low-lying areas, for example, can be difficult to accommodate with gravity-fed water and sewage, requiring a power grid instead. In a forced system, the pipe is pressurized to force the water and wastewater in a particular direction. An entire length of pipe can be forced open, or the pipeline can alternate between forced and gravity-fed areas, allowing nature to do some of the work of moving the water.
Engineers usually determine whether or not a principal force is needed in a particular area and perform calculations to determine the best size for the pipe, the amount of pressure needed, and how to create that pressure and keep it consistent and stable to avoid problems. This is done during the design phase, as public works departments prepare to renovate or expand a sewage system. Project details are often discussed in public meetings where members of a community have the opportunity to offer input.