Power system simulation is a computer-based method to determine the functionality and cost-effectiveness of a power system. It focuses on short-term profitability, long-term expansion, and cost management, identifying potential problems and weaknesses to optimize the system’s design and operation.
A power system simulation is a computer-based method of determining if a power system is functioning properly and if it is cost-effective to operate. These programs allow users to lay out a power system exactly as it would exist in real life. When the grid is complete, the program is able to simulate what would happen when the real version of the grid was online. Designers will use a power system simulation to determine if a configuration is working as intended and to spot any problems before they are built.
In most cases, this type of simulation focuses on three key areas: short-term profitability, long-term expansion, and cost management. Each of these key areas can be simulated independently or as a single time-focused study. Each of the three areas is vital to the success of any fuel system.
A short-term feasibility simulation focuses on the actual system design over everything else. These simulations test for situations that can occur in the grid that weren’t anticipated. These events can be dangerous, such as shorts or power drains, or benign, such as unexpected shutdowns or poor routing. These simulations help iron out physical and design issues that may exist in the grid before it is built.
The long-term part of a power system simulation centers on what will happen when the grid is used. These simulations will indicate weaknesses that may wear out over time. Using this information, designers can increase the strength of the weak points, which will make grid maintenance less expensive. Additionally, these simulations will help show where the grid may be missing in the future. If a particular neighborhood is small now, but growing rapidly, the simulation will indicate this so planners can strengthen areas that may not have sufficient coverage.
The last major area of a power system simulation is its operating cost. Power systems are both expensive to build and to maintain. Consequently, it is important for the designer to make the system as complete as possible the first time around. This will provide room for expansion in the network and keep change costs low.
In addition to the cost of building and maintaining the grid, power system simulation will also address the cost of moving electricity through the system. As energy travels through the wires, a small amount is lost. The larger and more complex the system, the greater the power dissipated. These simulations allow designers to balance cost versus complexity to keep the overall cost of maintaining and operating the system as low as possible.