What’s an erecting tower?

Print anything with Printful



Assembly towers are temporary scaffolding structures used on construction sites to support workers and materials. They are made of metal tubing with holes for easy connection and wood planking for safe walkways. Tower cranes may also be used for taller buildings. Disassembly begins at the top and undamaged sections may be kept for future use.

Assembly towers are simple structures that are commonly used on construction sites. A basic building tower is a temporary scaffolding structure created for the sole purpose of aiding in the construction of a permanent building. Towers of this type can be used to support workers, or as a means of maneuvering building materials into place with the use of a hoist or crane.

A basic assembly tower construction involves the use of solid metal tubing to create the basic structure. Usually, sections of pipe are threaded to allow for easy connection between sections. Holes are drilled in the pipes at precise points, allowing sections to be joined at different angles. This simplifies the adaptation of the tower configuration to the current needs of the construction process.

Along with metal scaffolding, wood planking is often used in the overall design. The planking effectively creates safe walkways for construction professionals to navigate as they work on various sections of the building construction. At the same time, the use of sturdy wooden planks allows for the creation of surfaces on which to place building material surfaces with the use of a crane or hoist. This allows the crew working on the building to have what they need at their fingertips, eliminating the need to constantly climb up and down the tower scaffolding.

It’s not unusual for tower cranes to be part of the erection tower project, especially when the construction project involves a building with more than a couple of stories. Installing a tower crane still requires the same basic process and materials as any erection tower, but it also requires creating reinforced sections that can support the weight of heavier machinery. The crane itself can be positioned on the framework, or simply hooked to the scaffolding, depending on the general conditions of the site and the design of the structure under construction.

When the erection tower is no longer needed, the process of disassembling the sections usually begins at the upper levels of the scaffolding and gradually moves towards ground level. While some construction companies discard sections of pipe after each project is completed, others choose to inspect sections and keep any that weren’t bent or otherwise damaged during their last use. Any retained sections are transported from the construction site and stored until their next use.